Sunday, July 20, 2008
June 26th -- Things are hopping!
Our kitchen island is framed in and plumbed. Cabinets are outlined on the floor so one can get a real sense of space.
We found this quite by surprise on the inside of our pantry! I'm kinda sad that this will be covered up by drywall before too long.
Electrical and plumbing work is underway. This pic is of our master bathroom. (wall where sinks will be installed.)
Stucco exterior is moving right along too! Unfortunately, they put the wrong color in the gables. I quickly called them and they corrected it within a day.
Sometime over the past month, Lee and I decided to change the plans for the house exterior. Originally, the plans called for vinyl siding on the sides and rear of the house. We upgraded the exterior to be full stucco and no vinyl siding. It sure looks nice. I'm so glad we did it!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment